Max Bright Suez Project

 

Bluetongue Civil were engaged by Max Bright to install slip drains on the batters of Cell 14, Suez waste transfer station at Hampton Park. Approximately 1.5km of slip drains were installed over a 2-week period. The existing poly liner was exposed using a Kubota 3t excavator with a tilt hitch. Much care was taken to not damage the existing poly liner which saves time and cost.

 Works included:

    • Installation of slip drains
    • Exposing of poly liner
Max Bright Suez Project
Max Bright Suez Project