SAMCO Cranbourne West Factory Construction

 

Bluetongue Civil were engaged by Samco to help with earthworks and construction at a factory site in Cranbourne West.  The use of a Kubota 3t excavator, Kubota SVL75-2 skid steer and Ford Louisville 10m3 tandem tipper assisted in excavation and installation of electrical conduits and pits, Sub grade preparation for the factory floor and carpark, offsite cartage, quarry products cartage and landscaping works. We worked closely with SAMCO to ensure all tasks were delivered on time and within budget.

Works included:

    • Site excavation
    • Carpark construction
    • Concreting preparation
    • Conduit installation
    • Landscaping
    • Retaining wall construction